Sh. Komandoo Reclamation Project was awarded to MTCC on 15th August 2012. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 20th October 2018....

G.A. Gemanafushi Harbour Project was awarded to MTCC on 27th December 2012. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 3rd April 2016.   The scope of this project included: Dredging and excavation 45828 cbm Construction of ramp 1.0 cbm Construction of...

Lh. Naifaru Harbour Project was awarded to MTCC on 27th December 2012. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 31st December 2017.   The scope of this project included: Dredging/excavation of new harbour basin, maximum specified depth of -3m...

L. Kunahandhoo Harbour Project was awarded to MTCC on 9th January 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 5th May 2014. The project includes development of a 91m long and 61m wide harbour with a...

L. Dhanbidhoo Harbour Project was awarded to MTCC on 4th February 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 14th March 2019   The scope of this project included: Dredging & excavation: Dredging of new basin 15,618.00 Cbm Dredging of new...

Lh. Kurendhoo Harbour Project was awarded to MTCC on 18th March 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 29th December 2017.   The scope of this project included: Dredging/excavation of new harbour basin, maximum specified depth of -3m...

G.A. Kanduhulhudhoo harbour construction was awarded to MTCC on 21st April 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 21st August 2017.   The scope of the project includes: Dredging of existing basin and channel- 15,000.0Cbm Breakwater & revetment Construction of...

G.A. Kondey harbour project was awarded to MTCC on 21st April 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 31st August 2017.   The scope of this project included: Dredging: Dredging/excavation of any material for the new harbour basin Maximum specified...

L. Maabaidhoo harbour project was awarded to MTCC on 21st April 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 30th September 2018.   The scope of this project included: Dredging: Dredging of new basin 16,170.18 Cbm Dredging of new channel 2,280.00...

M. Kolhufushi power system project was awarded to MTCC on 17th June 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 24th May 2014. This project includes electrification works for 164 houses....

G.A. Dhaandhoo Housing Project was awarded to MTCC on 18th November 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, started on 20th November and was completed on 26th December 2014....

A.Dh. Dhangethi Harbour Project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 121st August 2018.   The scope of this project included: Basin dredging – 33,553cbm, Channel dredging -24,013cbm, Harbour pavement 1070sqm Breakwater...

B. Thulhaadhoo Harbour Project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 25th December 2017.   The scope of this project included: Construction of rock boulder breakwater of total length...

Dh. Bandidhoo Harbour Project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 14th August 2017.   The scope of this project included: Dredging/excavation of new harbour basin, maximum specified depth...

F. Magoodhoo harbour project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 13th October 2016.   The scope of this project included: Dredging and excavation (basin)-28,531.72 m3 Dredging and excavation (channel)-12,677.83...

G.Dh. Madaveli harbour project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 7th August 2018.   The scope of this project included: Dredging: Maint. dredging of existing channel - 4,999.79...

N. Holhudhoo harbour project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 19th July 2017.   The scope of this project included: Dredging/excavation of any material for the new harbour...

Sh. Kanditheemu harbour project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 2nd December 2017.   The scope of this project included: Dredging 190630cbm Rock boulder breakwater 276.03m Rock boulder revetment 42.00m Quay...

Th. Madifushi Harbour Project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, is currently on hold due to community-quaywall concept changing.   This project involves: The dredging of harbour basin to -3M from...

L. Hithadhoo harbour project was awarded to MTCC on 16th March back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 31st December 2017.   The scope of this project included: Dredging/excavation of any material for the new harbour...

K. Guraidhoo harbour project was awarded to MTCC on 31st March back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 20th October 2017.   The scope if the project included: Harbour dredging- 4,865.53 cbm Entrance channel dredging 91cbm Construction of...

H.A. Dhidhoo shore protection project was awarded to MTCC on 12th June back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was started on 25th May 2014 and completed on 8th October the same year....

R. Fainu harbour project was awarded to MTCC on 21st July back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 22nd September 2016. This project included the construction of 93.15m x 61m harbour basin protected...

This project was awarded to MTCC on 27th March 2016 by the Ministry of Housing and Infrastructure. The project was completed on 2nd January 2019.   This project included: Sand fill to as per the drawing provided to MSL+1.4m 11,219 .0Cbm Construction and installation of concrete culvert (width-6m, length-15m,...

This project was awarded to MTCC on 13th July 2017 by the Ministry of Housing and Infrastructure. The project was completed on 15th May 2018.   This project included: Dredging harbour basin 14,964 CBM Sand cement bags Break water 68M Construction of Quay wall 165 M Beacon Installation 2 Nos Harbour paving...

MTCC started work on this project in March 2016. This project was completed in January 2018.   The Scope of this project included: Dredging: Maint Dredging of existing basin (Cbm)-12,270cbm Breakwater & revetment: Breakwater construction(sand bund) 62m Quaywall- QW block instllation 154m Harbour pavement- Installation of blocks 572sqm...

This project was awarded to MTCC in 2016 by  the Ministry of Housing and Infrastructure.   The project scope included: Reclamation works 148.000.00 cbm Protective coating/SP/QW 2570nos Quay wall sheet pilling 534m Quay wall anchoring 534m Quay wall capping 534m Relocation of tetrapod 510m Revetment sheet piling 510m Revetment capping 510m Revetment tetrapod core 510m Rock boulder...

This project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The project scope included: Construction of revetment on area -A 142m Construction of revetment on area -B 93m Construction of revetment on area -C 240m Construction of revetment on area -D 321m Construction of mega container...

N. Velidhoo IDB Harbour Project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The project scope included: Mobilisation to the site Demolition of existing Quay wall structures and depositing the debris to acceptable locations as directed by the Engineer.295m Demolition of existing breakwater structures...

N. Maalhendhoo IDB Harbour Project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The project scope included: Demolition of existing Quay wall and revetment structures and depositing the debris to acceptable locations as directed by the Engineer. Dredging Harbour basin to -3.00m level...

H.Dh. Nolhivaramfaru IDB Harbour Project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The Project comprised of: Harbour Dredging Harbour basin to -3.00m level 42,384 cbm Revetment construction 169 m Quay wall construction -Supply and fixing precast Quay wall units 324 m - in situ concrete...

H.Dh. Nolhivaram IDB Harbour Project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The Project comprised of: Dredging harbour basin to -3.00m level -37530cbm Quay wall construction: Supply and fixing precast Quay wall units 379m Cast in situ concrete 379m Supply and fixing 38mm tie...

Gn. Fuvamulah IDB Harbour Project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The Project comprised of: DREDGING Dismantling the timber fenders and depositing the debris to acceptable locations as directed by the Engineer 295m. Inclusive of dredging the harbour area to a depth...

This project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. Scope of the project included - Dredging and Excavation of 8680Cbm - Construction of Cargo loading jetty 64m - Supply and casting of RC Beams 233.98m - Installation of two street Lights & Mooring Rings -...

Lh. Naifaru Breakwater project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. Scope of the project included - Maintenance Dredging of 34,165cbm - Construction of Rock Boulder Breakwater 430m, - Construction of 85m revetment - Installation of Navigation aids  ...

Construction of Villimale’ west harbour was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. Scope of the project included - Dredging of 4,148cbm area - Quay wall construction of 76m - Construction of revetment 20m - Construction of Breakwater 55m - Construction of ramp - Installation of bollards...

Sh. Funadhoo Road Construction was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   Scope of the project included Subbase preparation for the carriageways 19,090cbm Excavate, 300mm wide strip at the middle of Planting and Drainage area 5,056m, Supply & lay kerb 6,686m, ...

N. Manadhoo harbour road, pavement and light project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The Project comprised of: Harbour road excavation, filling and compaction Sqm 5300 Supply and placing of interlocking blocks Sqm 5300 Placing of drainages No 89 Harbour pavement and lights Excavation,...

B. Eydhafushi capping work was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The Project comprised of extension of the existing quay wall with breakwater and adjacent shores protected with revetment. The project originally contained the following scope, namely; sandblasting of...

The R. Inguraidhoo construction of harbour project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2019.   The project included: Dredging/excavation of any material for the new harbour basin, maximum specified depth -3m MSL 2168cbm Armour rocks laid to...

K. Male' construction of MHI new extension project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2018.   The project included: Ground works: Excavation for foundation - 161.78 M3 Earth Filling – 117.79 M3...

F. Nilandhoo harbour construction was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2019.   The project included: Dredging and excavation- 322,113.90 m3 Revetment 324 m RC quay wall structure 244 m Harbour pavement 1220 m2...

The A. Dh. Fenfushi break water consstsruction project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2017.   The project included: Dredging and excavation (basin & channel) 33,262 m3 Breakwaters 385 m...

This project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2017.   The project included: Dredging 16378.20cbm Rock boulder breakwater 220.00m Quay wall Beam 286.00m Rock boulder revetment 365m Placement of interlocking blocks 790sqm beacons supply & installation 2nos Installation of two arm...

This project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2017.   The project included: BREAKWATER EXTENSION - Construction inclusive of all materials and workmanship as shown in the drawings Core: Rock boulders from existing breakwater, laid to the...

G.A. Dhaandhoo Football Stadium Reclamation was awarded to MTCC on 17th July 2017 by  the Ministry of Housing and Infrastructure. The Project comprises of dredging and excavation of any material for the reclamation. This project was completed on 18th August 2018....

Male' East Coast Breakwater Construction project was awarded to MTCC on 13th April 2018 by  the Ministry of National Housing and Infrastructure. The Project scope includes Male’ east coast side breakwater reconstruction and construction of drawings align with the proposed new drawings, construction of breakwater...

Awarded in 2016, Th. Madifushi shore protection project was signed between MTCC and the Ministry of Housing and Infrastructure. Under this project, 28 hectares of land was reclaimed in Th. Madifushi and 2070 meters of revetment was built for the coastal protection. The project was...

Awarded in 2015, Phase two of G.Dh. Gahdhoo Harbour project was signed between MTCC and the Ministry of Housing and Infrastructure. The project was completed in 2018.   This project included: Dredging: Maint. dredging of new harbour basin - 17,236.0 Cbm, Maint. dredging of existing channel -100.0 Cbm,...

Awarded in 2015, the construction of M. Dhiggarui harbour was signed between MTCC and Ministry of Housing and Infrastructure. The construction work of the 225m long and 91.44m wide harbour commenced in November, 2015 and work was completed in Dec, 2016, within 404 days of...

Awarded in 2015, the construction of N. Maafaru harbour was signed between MTCC and Ministry of Housing and Infrastructure. The main components of this harbour project included 37,530cbm of dredging and excavation, construction of a 379m quay wall and 204m breakwater and a 30m revetment,...

The construction of R. Innamaadhoo harbour was assigned to MTCC by Ministry of Housing and Infrastructure on 2nd December 2015. This project was concluded on 17th December 2017.   This project included: Habour Demolition of existing Quay wall structures and depositing the debris to acceptable locations as directed...

The project to construct A.A. Himendhoo's harbor was completed on 20th April 2020. Work done under the project includes: Dredging of harbor basin 20,330.00 cbm Entrance channel dredging 15,187.50 cbm Rock armor breakwater 140.50 m Rock armor revetment 70 m Construction of Quay wall 170 m Beacon Installation 4 nos Harbor paving works...

The construction of the breakwater for M. Naalaafushi was awarded to MTCC on 27th August back in 2018. The construction work for this project, awarded by Ministry of Housing and Infrastructure, has not begun work yet. The proposed project scope includes 123.07 meter rock bolder breakwater...

MTCC was award the project to construct the breakwater in A.A. Rasdhoo in 2018 by Ministry of Housing and Infrastructure. The contract was signed in 15th May 2018. MTCC completed the re-construction of 120 meter long breakwater at A.A. Rasdhoo on 23rd May 2019. Scope of this...