The construction of R. Innamaadhoo harbour was assigned to MTCC by Ministry of Housing and Infrastructure on 2nd December 2015. This project was concluded on 17th December 2017.
This project included:
Habour Demolition of existing Quay wall structures and depositing the debris to acceptable locations as directed by the Engineer 246 m
Demolition of existing breakwater structures and depositing the debris to acceptable locations as directed by the Engineer 151 m
Dredging Harbour basin to -3.00m level 20,077
Breakwater Construction:
Type 1 215 m
Quay wall construction:
Supply and fixing precast Quay wall units 304 m
Cast in situ concrete 304 m
Supply and fixing 38mm tie rod with 1000x1000x250mm anchor block 76 Nos
Supply and fixing 38mm tie rod with 500x750x250mm anchor block 75 nos
Supply and fixing 20mm SS hooks 56 Nos
Back filling behind quay wall 2,324 cbm
Others:
Mooring buoys 13 Nos
Fixing solar powered Navigation lights 2 Nos
Construction of Fish landing slab 48 sqm