Lh. Kurendhoo Harbour

Status

completed

About This Project

Lh. Kurendhoo Harbour Project was awarded to MTCC on 18th March 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 29th December 2017.

 

The scope of this project included:

Dredging/excavation of new harbour basin, maximum specified depth of -3m MSL; Total dredge volume is 50,480.00 CBM

Dredging/excavation of new entrance channel, maximum specified depth of -3m MSL; Total dredge volume is 2,916.00 CBM

Construction of rock boulder breakwater of total length 353m

Construction of rock boulder breakwater of total length 70m

Supply and installation of 2 Nos of navigational lights

Quwaywall by 396+352m

Construction of Ramp 1 Nos

Construction of interlocking pavement to the length of the harbour with a width of 5m; total 3,740 SQM

Project Tpe
Harbour Construction
Location
Lh. Kurendhoo
Client
Ministry of Housing and Infrastructure
Contract Sign Date
18th March 2013
Project Start Date
12th April 2013
Completion Date
29th December 2017