This project was awarded to MTCC in 2016 by the Ministry of Housing and Infrastructure.
The project scope included:
Reclamation works 148.000.00 cbm
Protective coating/SP/QW 2570nos
Quay wall sheet pilling 534m
Quay wall anchoring 534m
Quay wall capping 534m
Relocation of tetrapod 510m
Revetment sheet piling 510m
Revetment capping 510m
Revetment tetrapod core 510m
Rock boulder revetment 510m
Rock boulder breakwater 121m
Culverts road sub base 10,556sqm
Storm water line (settlement tanks & pipes)
Electrical cable line (pipes & junction box)
Road base course (ABC)10,556sqm
Placing Kerbs 3973m
Asphalt wearing 10,556sqm
Footpath preparation 3660sqm
Road Finishing works
Single arm light
Double arm light
Sewerage works (supply)
Sewerage works (installation)
Water network (supply)
Water network (installation)
Electrical works (supply)
Electrical works (installation)
Road sub base
Storm water line (settlement tanks)
Electrical cable junction box
Road base course (ABC)
Placing kerbs
Asphalt wearing
Footpath preparation
Road finishing works
Single arm light