L. Maabaidhoo harbour project was awarded to MTCC on 21st April 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 30th September 2018.
The scope of this project included:
Dredging:
Dredging of new basin 16,170.18 Cbm
Dredging of new channel 2,280.00 Cbm
Maint. dredging of existingg basin 3,560.00 Cbm
Additional dredging for BW core 6,376.91 Cbm
Quaywall:
QW block installation 369 m
Breakwater & revetment
Construction of breakwater (revised section) 254.06 m
Construction of revetment (S/C bags) 74.00 m
Construction of revetment (boulders) 39.00 m
Sundries:
Harbour pavement – installation of blocks 1,052.00 Sqm
Beacon installation 2 Nos
Harbour lights 18 Nos