Breakwater development of H.A. Vashafaru, Sh. Maaungoodhoo and R. Hulhudhuffaaru

Status

completed

About This Project

The construction of breakwater at H.A. Vashafaru, Sh. Maaungoodhoo and R. Hulhudhuffaaru was awarded to MTCC on 20th September back in 2017. The construction work for this project, awarded by Ministry of Housing and Infrastructure, was competed on 20th January 2019.

 

This project includes:

H.A. Vashafaru Breakwater: Channel breakwater extension type B (@1m depth) -32m

Sh. Maaungoodhoo: dredging and excavation

Maintanance Dredging and excavation of harbour 7170cbm

Breakwater: Armour rocks laid to the slopes defined in drawings and to lines and levels indicated in the cross section drawings. Rate shall include levelling and placing armour rocks 79m

R. Hulhudhuffaru dredging and excavation:

Maintanance Dredging and excavation of harbour 1810cbm

Breakwater : Diverting of existing rock boulder breakwater as per the new layout 17m

Armour rocks laid to the slopes defined in drawings and to lines and levels indicated in the cross section darawings. Rate shall include levelling and placing armour rocks 35m

Project Tpe
Shore Protection
Location
R. Hulhudhuffaaru
Sh. Maaungoodhoo
H.A. Vashafaru
Client
Ministry of Housing and Infrastructure
Contract Sign Date
20th September 2017
Project Start Date
11th January 2018
Completion Date
20th January 2019