This project was awarded to MTCC in 2015 by the Ministry of Housing and Infrastructure. The project was completed during 2017.
The project included:
BREAKWATER EXTENSION – Construction inclusive of all materials and workmanship as shown in the drawings
Core: Rock boulders from existing breakwater, laid to the slopes defined in drawings and to lines and levels indicated. 30.00 m
Armour Layer: Rock boulders 4-6T Armour rocks in proposed breakwater, laid to the slopes defined in drawings and to lines and levels indicated including making good the top surface as walkway. 30.00 m
BREAKWATER – Construction inclusive of all materials and workmanship as shown in the drawings
Core: Rock boulders from existing breakwater, laid to the slopes defined in drawings and to lines and levels indicated. 102.50m
Armour Layer: Rock boulders 4-6T Armour rocks in proposed breakwater, laid to the slopes defined in drawings and to lines and levels indicated including making good the top surface as walkway. 102.50m
Other:
Supply and placing additional navigational lights as shown on harbour layout drawing 2.00 no
Rectification of previously installed navigation lights 2.00 no
Rectification of streetlight foundations 10.00 no