H.Dh. Kumundhoo Harbour Project

Status

completed

About This Project

This project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2017.

 

The project included:

BREAKWATER EXTENSION – Construction inclusive of all materials and workmanship as shown in the drawings

Core: Rock boulders from existing breakwater, laid to the slopes defined in drawings and to lines and levels indicated. 30.00 m

Armour Layer: Rock boulders 4-6T Armour rocks in proposed breakwater, laid to the slopes defined in drawings and to lines and levels indicated including making good the top surface as walkway. 30.00 m

BREAKWATER – Construction inclusive of all materials and workmanship as shown in the drawings

Core: Rock boulders from existing breakwater, laid to the slopes defined in drawings and to lines and levels indicated. 102.50m

Armour Layer: Rock boulders 4-6T Armour rocks in proposed breakwater, laid to the slopes defined in drawings and to lines and levels indicated including making good the top surface as walkway. 102.50m

Other:

Supply and placing additional navigational lights as shown on harbour layout drawing 2.00 no

Rectification of previously installed navigation lights 2.00 no

Rectification of streetlight foundations 10.00 no

Project Tpe
Harbour Construction
Location
H.Dh. Kumundhoo
Client
Ministry of Housing and Infrastructure
Contract Sign Date
8th April 2015
Project Start Date
3rd July 2015
Completion Date
14th November 2017