G.Dh. Gahdhoo Habour Phase-2 Project

Status

completed

About This Project

Awarded in 2015, Phase two of G.Dh. Gahdhoo Harbour project was signed between MTCC and the Ministry of Housing and Infrastructure. The project was completed in 2018.

 

This project included:

Dredging: Maint. dredging of new harbour basin – 17,236.0 Cbm, Maint. dredging of existing channel -100.0 Cbm, Maint. dredging of existing basin- 1000.0 Cbm

Breakwater & revetment: Breakwater construction (B-B) -221.0 m, revetment- 25.0m

Quaywall: QW block installation – 267m

Sundries: Harbour pavement – Installation of blocks – 3055.0 Sqm, harbour lights – installation of lights – 13.0nos, beacon installation – 2nos

Project Tpe
Harbour Construction
Location
G.Dh. Gahdhoo
Client
Ministry of Housing and Infrastructure
Contract Sign Date
8th June 2015
Project Start Date
4th December 2016
Completion Date
7th June 2018