B. Eydhafushi capping work was awarded to MTCC in 2015 by the Ministry of Housing and Infrastructure. The Project comprised of extension of the existing quay wall with breakwater and adjacent shores protected with revetment. The project originally contained the following scope, namely; sandblasting of exiting sheet piles – 97m and casting of capping beam – 97m