Sh. Funadhoo Road Construction was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.

 

Scope of the project included

  • Subbase preparation for the carriageways 19,090cbm
  • Excavate, 300mm wide strip at the middle of Planting and Drainage area 5,056m,
  • Supply & lay kerb 6,686m,
  • Supply and placement of paving blocks at footpath area 5,562m
  • Road Markings 3,343m,
  • Installation of Hump/Speed Breaker 135m
  • Cut, fill, shape the subgrade and compact to get the specified cross elevation and CBR of 60% for the carriageways 19090cbm
  • Excavate, 300mm wide strip at the middle of planting and drainage area to a depth of 900mm.-5056m.
  • 200mm PVC pipes for electrical cables 600m
  • 100mm PVC pipes for telephone cables. 600m
Project Tpe
Road Construction
Location
Sh. Funadhoo
Client
Ministry of Housing and Infrastructure
Contract Sign Date
30th April 2015
Project Start Date
17th August 2015
Completion Date
31st December 2016