L. Hithadhoo harbour project was awarded to MTCC on 16th March back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 31st December 2017.
The scope of this project included:
Dredging/excavation of any material for the new harbour basin. Maximum specified depth -3m MSL 14,495cbm
Additional dredging for reclamation of harbour area as shown in the concept drawing 15,488cbm
Maintenance dredging/excavation of any material in the existing basin. Maximum specified depth -3m MSL 993cbm
Armour rocks laid to the slopes defined in drawings and to lines and levels indicated in the breakwater cross section. Rate shall include levelling and placing armour rocks 295m
Armour rocks laid to the slopes defined in drawings and to lines and levels indicated in the revetment cross section 42m