G.A. Kondey Harbour Project

Status

completed

About This Project

G.A. Kondey harbour project was awarded to MTCC on 21st April 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 31st August 2017.

 

The scope of this project included:

Dredging:

Dredging/excavation of any material for the new harbour basin

Maximum specified depth -3m MSL 11,934.9 Cbm

Dredging/excavation of any material for the new

Entrance channel, with width 23m. Maximum specified depth -3rn fMSL 15,180.0 Cbm

Dredging/excavation of any material for the new entrance channel, with width 23m. Maximum entrance channel, with width 23m. Maximum specified depth -3rn fMSL

Quaywall:

QW block installation 200.0 m

Breakwater & revetment

Construction of breakwater 114.0 m

Sand cement revetment 17.0 m

Break water core material 116.m

Construction of revetment40.0m

Sundries:

Harbour pavement – Installation of blocks 540.0Sqm

Beacon installation 2 Nos

Project Tpe
Harbour Construction
Location
G.A. Kondey
Client
Ministry of Housing and Infrastructure
Contract Sign Date
21st April 2013
Project Start Date
26th May 2013
Completion Date
31st August 2017