N. Velidhoo IDB Harbour Project was awarded to MTCC in 2015 by the Ministry of Housing and Infrastructure.
The project scope included:
Mobilisation to the site
Demolition of existing Quay wall structures and depositing the debris to acceptable locations as directed by the Engineer.295m
Demolition of existing breakwater structures and depositing the debris to acceptable locations as directed by the Engineer.LSm
Demolition of existing timber jetty and depositing the debris to acceptable locations as directed by the Engineer.LS1
Dredging harbour basin to -3.00m level 55,068cbm
Breakwater Construction:
Type 1 197 m
Type 2 150m
Type 2 96m
Revetment using coral debris 140m
Quay wall construction:
Supply and fixing precast quay wall units 337 m
Cast in situ concrete 337 m
Supply and fixing 38mm tie rod with 1000x1000x250mm anchor block 84(Nos)
Supply and fixing 20mm SS hooks 42 (Nos)
Back filling behind quay wall 2,861 cbm
Others:
Mooring buoys 32 (Nos)
Fixing solar powered navigation lights 4(Nos)
Construction of bridge LS 1
Construction of fish landing slab