N. Velidhoo IDB Harbour Project – LOT2

Status

completed

About This Project

N. Velidhoo IDB Harbour Project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.

 

The project scope included:

Mobilisation to the site

Demolition of existing Quay wall structures and depositing the debris to acceptable locations as directed by the Engineer.295m

Demolition of existing breakwater structures and depositing the debris to acceptable locations as directed by the Engineer.LSm

Demolition of existing timber jetty and depositing the debris to acceptable locations as directed by the Engineer.LS1

Dredging harbour basin to -3.00m level 55,068cbm

Breakwater Construction:

Type 1 197 m

Type 2 150m

Type 2 96m

Revetment using coral debris 140m

Quay wall construction:

Supply and fixing precast quay wall units 337 m

Cast in situ concrete 337 m

Supply and fixing 38mm tie rod with 1000x1000x250mm anchor block 84(Nos)

Supply and fixing 20mm SS hooks 42 (Nos)

Back filling behind quay wall 2,861 cbm

Others:

Mooring buoys 32 (Nos)

Fixing solar powered navigation lights 4(Nos)

Construction of bridge LS 1

Construction of fish landing slab

Project Tpe
Harbour Construction
Location
N. Velidhoo
Client
Ministry of Housing and Infrastructure
Contract Sign Date
2nd December 2015
Project Start Date
31st January 2016
Completion Date
29th August 2017