design and build of H.A. Thuraakunu Harbour

Status

completed

About This Project

This project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2017.

 

The project included:

Dredging 16378.20cbm

Rock boulder breakwater 220.00m

Quay wall Beam 286.00m

Rock boulder revetment 365m

Placement of interlocking blocks 790sqm beacons supply & installation 2nos

Installation of two arm street light along harbour 12nos

Fish landing ramp of 8mx6m 1 nos

Installation of precast drainage gutter 6 nos

Project Tpe
Harbour Construction
Location
H.A. Thuraakunu
Client
Ministry of Housing and Infrastructure
Contract Sign Date
8th April 2015
Project Start Date
16th November 2015
Completion Date
29th April 2017