This project was awarded to MTCC in 2015 by the Ministry of Housing and Infrastructure. The project was completed during 2017.
The project included:
Dredging 16378.20cbm
Rock boulder breakwater 220.00m
Quay wall Beam 286.00m
Rock boulder revetment 365m
Placement of interlocking blocks 790sqm beacons supply & installation 2nos
Installation of two arm street light along harbour 12nos
Fish landing ramp of 8mx6m 1 nos