Maldives Transport and Contracting Company, MTCC has signed with Ministry of National Planning, Housing and Infrastructure towards implementing shore protection project at Ha. Hoarafushi. The agreement relating to the project was signed by CEO Adam Azim signed on behalf of MTCC and Director General Ms. Fathimath...

Maldives Transport and Contracting Company, MTCC was handed over the project to conduct shore protection project at the waste collection area of Thilafushi by Ministry of Environment. Scope of the project included Dredging and excavation of 446,203 meter. Construction a 911-meter concrete quay wall Construction of 877-meter revetment and cargo ramp...

N. Holhudhoo coastal project was awarded to MTCC on 4th September 2013. The work for this project, awarded by the Ministry of Environment and Energy, was completed on 21st March 2015. The proposed harbour location is same as the existing harbour. Harbour comprised the construction...

R. Maduvvari Coastal Protection Project was awarded to MTCC on 4th September 2013. The work for this project, awarded by the Ministry of Environment and Energy, was completed on 7th June 2015. This project was to design and build a costal structure at R. Maduvvari.   The...

H.A. Dhidhoo shore protection project was awarded to MTCC on 12th June back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was started on 25th May 2014 and completed on 8th October the same year....

K. Vilimale' coastal protection project was awarded to MTCC on 1st October 2014, by the Ministry of Environment and Energy. It consisted of dredging of 4,148 cbm harbour basin and new channel, construction of 55m breakwater, construction of 76m concrete quay wall, and navigation lights...

This project was awarded to MTCC in 2016 by  the Ministry of Housing and Infrastructure.   The project scope included: Reclamation works 148.000.00 cbm Protective coating/SP/QW 2570nos Quay wall sheet pilling 534m Quay wall anchoring 534m Quay wall capping 534m Relocation of tetrapod 510m Revetment sheet piling 510m Revetment capping 510m Revetment tetrapod core 510m Rock boulder...

This project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The project scope included: Construction of revetment on area -A 142m Construction of revetment on area -B 93m Construction of revetment on area -C 240m Construction of revetment on area -D 321m Construction of mega container...

Lh. Naifaru Breakwater project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. Scope of the project included - Maintenance Dredging of 34,165cbm - Construction of Rock Boulder Breakwater 430m, - Construction of 85m revetment - Installation of Navigation aids  ...

B. Eydhafushi capping work was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The Project comprised of extension of the existing quay wall with breakwater and adjacent shores protected with revetment. The project originally contained the following scope, namely; sandblasting of...

Sh. Funadhoo Shore protection project was awarded to MTCC in 2017 by  DSP.   The Project comprises of: Dredging and reclamation: Preparation of sand bund to mark the reclamation boundary 46,700cbm Revetment: Construction of rock boulder revetment 600m...

Velana International Airport South West Rectification Work was awarded to MTCC on 26th December 2017 by  the Maldives Airports Company Limited. The Project comprises of constructing quay wall with revetment & reclamation of existing road side, adjacent shores protected with revetment, commissioning and handover. Scope pf...

Male' East Coast Breakwater Construction project was awarded to MTCC on 13th April 2018 by  the Ministry of National Housing and Infrastructure. The Project scope includes Male’ east coast side breakwater reconstruction and construction of drawings align with the proposed new drawings, construction of breakwater...

Awarded in 2016, Th. Madifushi shore protection project was signed between MTCC and the Ministry of Housing and Infrastructure. Under this project, 28 hectares of land was reclaimed in Th. Madifushi and 2070 meters of revetment was built for the coastal protection. The project was...

G.Dh. Thinadhoo Soft Coastal Protection Measures project was assigned to MTCC by the Government of Maldives, and work commenced on the project on 16th February 2015 and the project was completed on 24th September 2016. The main components of this project include, a shore protection...

Awarded in 2015, the construction of M. Naalaafushi harbour was signed between MTCC and Ministry of Housing and Infrastructure. This project was completed in 2016. The main components of this project include, dredging and revetment....

H.Dh. Kulhudhuffushi Shore Protection was awarded to MTCC by Awarded by Ministry of National Planning and Infrastructure. Scope of the Project includes Dredging & Reclamation 29,735-cubic-meters Construction of rock boulder revetment 800-meters Lake fill area 72,067-cubic-meter The project cost is MVR53432377.074.  ...

The construction of the Quaywall at G.A. Kanduhulhudhoo was awarded to MTCC on 27th March 2019. The construction work for this project, awarded by Ministry of Housing and Infrastructure, is currently on-going. Scope of the project includes Construction of 414-meter quay wall Construction of a 40-meter breakwater ...

The construction of the breakwater for M. Naalaafushi was awarded to MTCC on 27th August back in 2018. The construction work for this project, awarded by Ministry of Housing and Infrastructure, has not begun work yet. The proposed project scope includes 123.07 meter rock bolder breakwater...