MTCC has signed with Maldives National Planning, Housing and Infrastructure to design and build an airport at M. Muli. CEO Adam Azim signed on behalf of MTCC and Director General Ms. Fathimath Shaana Farooq signed on behalf of the MNPHI. Scope of the project includes Reclamation operations...

Design and Build of GDh. Faresmaathodaa Airport was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 10th November 2020. Scope of the project includes Construction of 1200m runway, taxiway, apron with shoulder and service roads with all operational facilities The project is...

GDh. Maavarulu Airport Building Phase 2 project was handed over to MTCC by Ministry of Transport and Civil Aviation on 25th July 2019.  Work being conducted under the project includes Development of Passenger Terminal Building Development of fire Building, staff quarter Development of powerhouse, guard post, restaurant and...

Phase two of Th. Thimarafushi Airport was awarded to MTCC on 12th January back in 2014. The work for this project, awarded by the Maldives Airports Company Limited, is currently on hold. This project involved full construction of runway, taxi way, apron, road, terminal building,...

H.Dh. Kulhudhuffushi Terminal Excavation and Back Filling project was awarded to MTCC in 2018 by the Regional Airports. This project was completed on 25th September 2018 Scope of the project included Terminal area Excavation 7,125-square-meters Disposal of unsuitable materials 4,500.00-cubic-meters Terminal area backfilling 8,250.00-cubic-meters General leveling...