14 Jul We have commenced installation of precast concrete blocks required for the construction of quay wall of Lh. Hinnavaru Harbor
Posted at 14:26h
in
News
by Samahath Zuhuree
We have commenced installation of precast concrete blocks required for the construction of quay wall of Lh. Hinnavaru Harbor on 11th July 2021.
Scope of works for the project include, reclamation operations of 3.2 hectare; dredging operations of 65,170.76cbm; construction of a 421m quay wall; a 123.9m breakwater; a 170.55m revetment. The value of the project is MVR 99.52 million.
Sorry, the comment form is closed at this time.