Sh. Feevah harbor upgrading project was awarded to MTCC on 2nd July 2019 by the Ministry of National Planning and Infrastructure.
This project includes
- Dredging 23859.73cbm Harbor Basin
- Dredging 14,743Â cbm Channel Area
- Supplying of L-Blocks (2m width)232 Nos
- Installation of Anchor blocks to the quay wall Blocks
- Cast 464m in-situ wall
- Cast 464m top slab
- Installation of Mooring hooks
- Placing of geotextile
- Developing harbor pavement
- Installation of two arm street lights
- Construction of breakwater
- Construction of revetment
- Installation of navigation lights
- Installing floating light buoys along the harbor channel
- Supply and installation of Drains at 40m intervals
- Developing ramp for landing crafts
- Supply & installation of storm water drainage pipe        Â
- Supply & lay curbs
The  MVR 69,301,516.27 project is to be completed within 390 days