Project to upgrade Sh. Feevah Harbor

Status

on-going

About This Project

Sh. Feevah harbor upgrading project was awarded to MTCC on 2nd July 2019 by  the Ministry of National Planning and Infrastructure.

This project includes

  • Dredging 23859.73cbm Harbor Basin
  • Dredging 14,743 cbm Channel Area
  • Supplying of L-Blocks (2m width)232 Nos
  • Installation of Anchor blocks to the quay wall Blocks
  • Cast 464m in-situ wall
  • Cast 464m top slab
  • Installation of Mooring hooks
  • Placing of geotextile
  • Developing harbor pavement
  • Installation of two arm street lights
  • Construction of breakwater
  • Construction of revetment
  • Installation of navigation lights
  • Installing floating light buoys along the harbor channel
  • Supply and installation of Drains at 40m intervals
  • Developing ramp for landing crafts
  • Supply & installation of storm water drainage pipe         
  • Supply & lay curbs

The  MVR 69,301,516.27  project is to be completed within 390 days

Project Tpe
Harbour Construction
Location
Sh. Feevah
Client
Ministry of National Planning and Infrastructure
Contract Sign Date
2nd July 2019
Project Start Date
23rd July 2019