G.A. Kondey harbour project was awarded to MTCC on 21st April 2013. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 31st August 2017.
The scope of this project included:
Dredging:
Dredging/excavation of any material for the new harbour basin
Maximum specified depth -3m MSL 11,934.9 Cbm
Dredging/excavation of any material for the new
Entrance channel, with width 23m. Maximum specified depth -3rn fMSL 15,180.0 Cbm
Dredging/excavation of any material for the new entrance channel, with width 23m. Maximum entrance channel, with width 23m. Maximum specified depth -3rn fMSL
Quaywall:
QW block installation 200.0 m
Breakwater & revetment
Construction of breakwater 114.0 m
Sand cement revetment 17.0 m
Break water core material 116.m
Construction of revetment40.0m
Sundries:
Harbour pavement – Installation of blocks 540.0Sqm
Beacon installation 2 Nos