Work on Design and Build of R. Rasmaadhoo Harbour is well underway.

Work on Design and Build of R. Rasmaadhoo Harbour is well underway. We have commenced construction of breakwater. Demolition of the existing quay wall is currently ongoing.
Project works consists of; dredging and excavation operations of 8,100cbm; construction of a 377m breakwater installation of 600sqm of paved area, installation of navigation lights and streetlights. The value of the project is MVR 18.7 million.