25 Mar Work on Design and Build of R. Maduvvari South Harbour is well underway
Work on Design and Build of R. Maduvvari South Harbour is well underway, with overall 60% project progress. Installation of precast concrete blocks required for the quay wall construction is currently ongoing, with overall 65% completion.
The R. Maduvvari South Harbor development scheme consists of dredging 7,280cbm from channel, dredging 65,520cbm from harbor basin, breakwater construction of 411m, quay wall construction of 566m, revetment construction of 135m, installation of 2825 sqm paved area and installation of navigation lights and streetlights.
Sorry, the comment form is closed at this time.