Work on design and build of Ha. Muraidhoo Harbor Development Project is well underway

Work on design and build of Ha. Muraidhoo Harbor Development Project is well underway, with overall 57% project progress, We have completed construction of quay wall.
The scope of the project includes, construction of a 212m quay wall, a 407m breakwater, a 107m repair work of breakwater, a 105m revetment, a 50m groyne, dredging operations of harbor and channel, construction of a ramp, a walkway bridge, installation of navigation lights and harbor lights. The value of the project is MVR 33.7 million.