Work on design and build of Ha. Ihavandhoo harbor development project is ongoing , with overall 88% project progress.

Work on design and build of Ha. Ihavandhoo harbor development project is ongoing , with overall 88% project progress. Breakwater variation works are ongoing, with 95% completion. The Final shipment of Rock boulders needed for the project has been delivered to the project site.
Scope of works for the project include dredging and excavation operations of 30,509cbm; the construction of a 95m quay wall; a 284m breakwater; and a 178m revetment. Additionally, the installation of navigation lights, installation of streetlights and construction of 4,582sqm of paved area will also be undertaken. The value of the project is MVR 59.07 million.