Work on Design and Build of B. Fulhadhoo Harbour is well underway

Work on Design and Build of B. Fulhadhoo Harbour is well underway, with overall 86% project progress. The second shipment of rock boulders needed for the construction of breakwater have been delivered to the project site.
Scope of works for the project include dredging operations of 51,861.5cbm; the construction of a 223m quay wall; a 108m breakwater; and a 283m revetment. Additionally, the installation of 558sqm of paved area, installation of navigation lights and streetlights will also be undertaken. The value of the project is MVR 49.4 million.