Work on Design and Build of B. Fehendhoo Harbour is well underway

Work on Design and Build of B. Fehendhoo Harbour is well underway, with overall 50% project progress. Installation of precast concrete blocks required for quay wall construction is currently ongoing, with 31% completion.
Scope of works for the project include channel dredging operations of 25,000cbm; harbor basin dredging operations of 18,500cbm, the construction of a 214m quay wall; a 130m breakwater; and a 282m revetment. Additionally, the installation of navigation lights, installation of streetlights and installation of 558sqm of paved area will also be undertaken. The estimated value of the project is MVR 49.66 million. The project was mobilized on 10th November 2019.
No Comments

Sorry, the comment form is closed at this time.