We have completed the installation of precast concrete blocks required for the construction of the quay wall of R. Maduvvari South Harbor today.
The R. Maduvvari South Harbor development scheme consists of dredging 7,280cbm from channel, dredging 65,520cbm from harbor basin, breakwater construction of 411m, quay wall construction of 566m, revetment construction of 135m, installation of 2825 sqm paved area and installation of navigation lights and streetlights. The value of the project is MVR 72.66 million.