28 Sep G.Dh. Madaveli and Hoadedhoo Causeway
This project was awarded to MTCC on 27th March 2016 by the Ministry of Housing and Infrastructure. The project was completed on 2nd January 2019. This project included: Sand fill to as per the drawing provided to MSL+1.4m 11,219 .0Cbm Construction and installation of concrete culvert (width-6m, length-15m,...