This project was awarded to MTCC on 27th March 2016 by the Ministry of Housing and Infrastructure. The project was completed on 2nd January 2019.   This project included: Sand fill to as per the drawing provided to MSL+1.4m 11,219 .0Cbm Construction and installation of concrete culvert (width-6m, length-15m,...

This project was awarded to MTCC in 2016 by  the Ministry of Housing and Infrastructure.   The project scope included: Reclamation works 148.000.00 cbm Protective coating/SP/QW 2570nos Quay wall sheet pilling 534m Quay wall anchoring 534m Quay wall capping 534m Relocation of tetrapod 510m Revetment sheet piling 510m Revetment capping 510m Revetment tetrapod core 510m Rock boulder...