Design and Build of Sh.Komandoo Harbor Upgrade was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 4th August 2019 Scope of the project includes Channel Dredging 14,731cbm Maintenance & New harbor basin  Dredging35,348cbm  Developing 12m Breakwater Developing 20m Revetment 20m Developing 190m Quay wall Developing 1,991sqm...

Design and Build of Sh. Foakaidhoo Harbour Upgrade was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 29th December 2019 Scope of the project includes Dredging and excavation 45,795cbm Development of 507m Breakwater Development of 100m Revetment 100m Development of 464m Quay wall Development of 2,320sqm of Pavement ...

Design and Build of Sh. Feydhoo Harbour Upgrade was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 29th December 2019 Scope of the project includes Dredging and excavation 27,500cbm  Development of 378m breakwater Development of 90m revetment Development of 276m quay wall Development of 1,380sqm pavement Installation...

Design & Build of Harbour Upgrade in S. Meedhoo was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 23rd June 2019 Work on Design and Build of S. Meedhoo Harbour is well underway, with overall 90% project progress. We have completed quay wall construction works. Pavement...

The Harbor repair and dredging in R.Vandhoo was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 26th August 2019  Scope of the project includes Demolition of Existing Cement bag wall structures and depositing the debris   Dredging, Excavation Harbour Basin-  cbm 1,870.00   Quay wall -m 75.00   Precast blocks Delivery nos 38.00   Block...

K. Thilafushi harbour re-development project was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 21st November 2019  Scope of the project includes Site clearance and general earthworks Development of concrete carriageway Surface water management Development of administrative building Workshop and Civil works...

Harbor Redevelopment and Reclamation Project K.Dhoonidhoo project was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 05th September 2019 The project was mobilized on 21st September 2020. Scope of the project includes Dredging and excavation 4.61 acre Reclamation 3.75 acre  Construction of Breakwater 370m  ...

The project to re-develop the harbor of Dh. Hulhudheli was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 10-12-2019. Work conducted under the project includes Dredging & Excavation 45,585cbm Construction of 60m Groynes  Construction of 432m quay wall   Development of 227m breakwater ...

The project to expand and upgrade the harbor of HDh. Kulhudufushi was contracted to Maldives Transport and Contracting Company, MTCC by Ministry of National Planning, Housing and Infrastructure 12th December 2018.   Scope of the project includes Dredging operations of 236,844-cubic-meter  Construction of a 500-meter quay wal Installation of 79-meter drainage gutter, mooring...