The pre-cast concrete blocks required for quay wall construction of R. Angolhitheem Harbour have been delivered to the project site on 12th April 2021. We have scheduled to commence the installation of pre-cast concrete blocks during this month.
The R. Angolhitheem Harbour project consists of; dredging and excavation operations of 42,615 cbm; construction of a 221m breakwater; a 166m revetment; a 91m quay wall; installation of 1110sqm paved area, installation of streetlights and navigation lights. The value of the project is MVR 44.7 million.