Velana International Airport South West Rectification Work was awarded to MTCC on 26th December 2017 by the Maldives Airports Company Limited. The Project comprises of constructing quay wall with revetment & reclamation of existing road side, adjacent shores protected with revetment, commissioning and handover.
Scope pf the project included
- Removal of Land side revetment head 470-meter
- Â Back fill and compaction of 470-meter
- Laying of lean concrete pre-casting units on 470-meter
- Casting of Pre-cast units 313nos
- Placing of Removed rock boulders at a 470-meter area
- Supply & placing of additional rocks on a 470-meter area
- Placing of Filter Rocks at a 470-meter area
- Extension of Geo fabric with 600gsm on a 470-meter area