About This Project
The project to develop football pitches in 7 islands were handed over to MTCC by Ministry of Youth Sports and Community Empowerment on on 11th September 2019. Under the project football pitches will be developed in L. Gan, G.Dh. Thinadhoo, Th. Thimarafushi, V. Keyodhoo, H.A. Hoarafushi, S. Feydhoo and Gn. Fuvahmulah .
Work to be conducted in each island as part of the project includes
- Site Clearing
- Excavate mud material and disperse the football groundÂ
- Excavate sufficient filling materialÂ
- Transport sufficient filling material to the football groundÂ
- Compaction and level the ground to the required levelÂ
- Casting of Drainage Gutter
- Casting of Drainage Gutter Top
- Laying of Drainage Gutter TopÂ
- Casting Soak pit
- Casting Soak pit Top
- Installing of Soak pit
- Casting of Kerb Stone
- Laying of Kerb stone and pipe
- Casting of Pavement strip Â
The MVRÂ 2,552,907.82Â project will be completed within 60 days.Â