About This Project
Sh. Funadhoo Road Construction was awarded to MTCC in 2015 by the Ministry of Housing and Infrastructure.
Scope of the project included
- Subbase preparation for the carriageways 19,090cbm
- Excavate, 300mm wide strip at the middle of Planting and Drainage area 5,056m,
- Supply & lay kerb 6,686m,
- Supply and placement of paving blocks at footpath area 5,562m
- Road Markings 3,343m,
- Installation of Hump/Speed Breaker 135m
- Cut, fill, shape the subgrade and compact to get the specified cross elevation and CBR of 60% for the carriageways 19090cbm
- Excavate, 300mm wide strip at the middle of planting and drainage area to a depth of 900mm.-5056m.
- 200mm PVC pipes for electrical cables 600m
- 100mm PVC pipes for telephone cables. 600m