R. Inguraidhoo Construction of Harbour

Status

completed

About This Project

The R. Inguraidhoo construction of harbour project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2019.

 

The project included:

Dredging/excavation of any material for the new harbour basin, maximum specified depth -3m MSL 2168cbm

Armour rocks laid to the slopes defined in drawings and to lines and levels indicated in the cross section drawings. Rate shall include levelling and placing armour rocks 288m

Project Tpe
Harbour Construction
Location
R. Inguraidhoo
Client
Ministry of Housing and Infrastructure
Contract Sign Date
14th April 2015
Project Start Date
4th November 2015
Completion Date
24th January 2019