Male’ East Coast Breakwater Construction

Status

on-hold

About This Project

Male’ East Coast Breakwater Construction project was awarded to MTCC on 13th April 2018 by  the Ministry of National Housing and Infrastructure. The Project scope includes Male’ east coast side breakwater reconstruction and construction of drawings align with the proposed new drawings, construction of breakwater 430.00 m, construction pavement 430 m, construction of gutters 405 m and construction of two pump stations.

Project Tpe
Shore Protection
Location
Client
Ministry of Housing and Infrastructure
Contract Sign Date
13th April 2018
Project Start Date
6th September 2018