Lh. Naifaru Harbour Project

Status

completed

About This Project

Lh. Naifaru Harbour Project was awarded to MTCC on 27th December 2012. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 31st December 2017.

 

The scope of this project included:

Dredging/excavation of new harbour basin, maximum specified depth of -3m MSL; Total dredge volume is 26,347.25 CBM

Removal of the existing breakwater of total length 307 m

Construction of rock boulder breakwater of total length 400 m

Supply and installation of 2 number of navigational lights

Project Tpe
Harbour Construction
Location
Lh. Naifaru
Client
Ministry of Housing and Infrastructure
Contract Sign Date
27th December 2012
Project Start Date
1st February 2013
Completion Date
31st December 2017