H.Dh. Kulhudufushi terminal excavation and back filling work was handed over to MTCC by Regional Airports.
The project was completed in 2018.
Scope of this project included
– Excavation of 7,125-square-meter at the terminal area
– Disposal of unsuitable materials of 4,500-cubic-meter
– Backfilling works on an area of 8,250-cubic-meter for the terminal area
– General leveling of 3,750-square-meter at the terminal area