Design and Build of Coastal protection structures at N. Fohdhoo

Status

completed

About This Project

The project to design and build coastal protection structures at N. Fohdhoo was awarded to MTCC by Ministry of National Planning, Housing and Infrastructure on 25th February 2020 

Scope of the project includes

  • Sand filtering works of 1,400cbm
  • Sand filling for Geo bags 570 nos 
  • Sand backfilling works 5,000cbm
  • Placing of Geo Bags 570m 

The MVR 7.6M project is to be completed within 180 days 

Project Tpe
Coastal Protection
Location
N. Fohdhoo
Client
Ministry of National Planning and Infrastructure
Contract Sign Date
25th February 2020
Completion Date
26th July 2020