Design and Build of Coastal Protection Structures at AA. Rasdhoo was awarded to MTCC on 5th September 2019 by  the Ministry of National Planning and Infrastructure.

The work to be done under the 13.3 Million Rufiyaa project includes

  • Construction of New 175m Groynes 
  • Construction of 39m Revetment
  • Removal of Garbage along the beach
  • Backfilling of beach area

This project is co-funded by Indian and Maldivian government.

 

Project Tpe
Coastal Protection
Location
A.A. Rasdhoo
Client
Ministry of National Planning and Infrastructure
Contract Sign Date
5th September 2019
Completion Date
30th June 2020