Construction of ring road at Gn. Fuvahmulah

Status

completed

About This Project

The construction of ring road at Gn. Fuvahmulah was signed between the Permanent Secretary at the Ministry of Planning and Infrastructure, Zeeniya Ahmed Hameed and the CEO of MTCC Hassan Shah, on March 27th, 2019.

Scope of the project includes
  • Construction and development of 20,650sqm asphalt road with natural infiltration system
  • Installation of 144 LED streetlights; speed breakers and road markings.
Ongoing work include
  • Paving a 10, 325 sqm area on both sides of the road
The project valued at MVR. 32.04 million is nearing completion.
Project Tpe
Road Construction
Location
Gn. Fuvahmulah
Client
Ministry of National Planning and Infrastructure
Contract Sign Date
27th March 2019
Completion Date
31st December 2020