26 Sep design and build of H.A. Thuraakunu Harbour
This project was awarded to MTCC in 2015 by the Ministry of Housing and Infrastructure. The project was completed during 2017. The project included: Dredging 16378.20cbm Rock boulder breakwater 220.00m Quay wall Beam 286.00m Rock boulder revetment 365m Placement of interlocking blocks 790sqm beacons supply & installation 2nos Installation of two arm...