This project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2017.   The project included: Dredging 16378.20cbm Rock boulder breakwater 220.00m Quay wall Beam 286.00m Rock boulder revetment 365m Placement of interlocking blocks 790sqm beacons supply & installation 2nos Installation of two arm...