Land Reclamation of N. Velidhoo boat beaching area was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure. Scope of works for the project include Land reclamation operations of 3.48 hectares Levelling 138,247sqm of reclaimed area Construction of 255m revetment The value of the...

MTCC was awarded the construction of N. Miladhoo harbour on 25th September 2019. The project was mobilized on 25th March 2020. The first shipment of rock boulders has been delivered to the project site. The scope of the project includes: Dredging and excavation operations of 37,222cbm; Construction of...

Work on Design and Build of N. Landhoo Harbour was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure. Scope of the project includes Dredging and excavation operations of 25,000cbm Construction of a 256m quay wall Construction of a 401m breakwater Construction of...

N. Holhudhoo coastal project was awarded to MTCC on 4th September 2013. The work for this project, awarded by the Ministry of Environment and Energy, was completed on 21st March 2015. The proposed harbour location is same as the existing harbour. Harbour comprised the construction...

N. Holhudhoo harbour project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 19th July 2017.   The scope of this project included: Dredging/excavation of any material for the new harbour...

N. Velidhoo IDB Harbour Project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The project scope included: Mobilisation to the site Demolition of existing Quay wall structures and depositing the debris to acceptable locations as directed by the Engineer.295m Demolition of existing breakwater structures...

N. Maalhendhoo IDB Harbour Project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The project scope included: Demolition of existing Quay wall and revetment structures and depositing the debris to acceptable locations as directed by the Engineer. Dredging Harbour basin to -3.00m level...

This project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. Scope of the project included - Dredging and Excavation of 8680Cbm - Construction of Cargo loading jetty 64m - Supply and casting of RC Beams 233.98m - Installation of two street Lights & Mooring Rings -...

N. Manadhoo harbour road, pavement and light project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The Project comprised of: Harbour road excavation, filling and compaction Sqm 5300 Supply and placing of interlocking blocks Sqm 5300 Placing of drainages No 89 Harbour pavement and lights Excavation,...

Awarded in 2015, the construction of N. Maafaru harbour was signed between MTCC and Ministry of Housing and Infrastructure. The main components of this harbour project included 37,530cbm of dredging and excavation, construction of a 379m quay wall and 204m breakwater and a 30m revetment,...