This project was awarded to MTCC in 2016 by  the Ministry of Housing and Infrastructure.   The project scope included: Reclamation works 148.000.00 cbm Protective coating/SP/QW 2570nos Quay wall sheet pilling 534m Quay wall anchoring 534m Quay wall capping 534m Relocation of tetrapod 510m Revetment sheet piling 510m Revetment capping 510m Revetment tetrapod core 510m Rock boulder...

K. Male' construction of MHI new extension project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2018.   The project included: Ground works: Excavation for foundation - 161.78 M3 Earth Filling – 117.79 M3...

Male' East Coast Breakwater Construction project was awarded to MTCC on 13th April 2018 by  the Ministry of National Housing and Infrastructure. The Project scope includes Male’ east coast side breakwater reconstruction and construction of drawings align with the proposed new drawings, construction of breakwater...