N. Maalhendhoo IDB Harbour Project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure.   The project scope included: Demolition of existing Quay wall and revetment structures and depositing the debris to acceptable locations as directed by the Engineer. Dredging Harbour basin to -3.00m level...