This project was awarded to MTCC on 27th March 2016 by the Ministry of Housing and Infrastructure. The project was completed on 2nd January 2019.   This project included: Sand fill to as per the drawing provided to MSL+1.4m 11,219 .0Cbm Construction and installation of concrete culvert (width-6m, length-15m,...