Road Development Project of Ha. Hoarafushi was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 8th April 2021. COO Shahid Hussain Moosa signed on behalf of MTCC and Ms. Zeeniya Ahmed Hameed, Permanent Secretary signed on behalf of MNPHI. Scope of of...

Channel and maintenance dredging of Ha. Baarah was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure. Scope of the project includes Channel dredging operations of 79,100cbm Existing basin maintenance dredging of 8,600 Supply and installation of navigational aids The value of the project...

Maldives Transport and Contracting Company, MTCC has signed with Ministry of National Planning, Housing and Infrastructure towards implementing shore protection project at Ha. Hoarafushi. The agreement relating to the project was signed by CEO Adam Azim signed on behalf of MTCC and Director General Ms. Fathimath...

H.A. Dhidhoo shore protection project was awarded to MTCC on 12th June back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was started on 25th May 2014 and completed on 8th October the same year....

This project was awarded to MTCC on 14th November 2016 by the Ministry of Home Affairs. The goal of this project was to construct a Boundary wall at H.A. Dhihdhoo Cemetery. The project was completed on 13th November 2017.   The scope of this project included: Concrete work...

This project was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The project was completed during 2017.   The project included: Dredging 16378.20cbm Rock boulder breakwater 220.00m Quay wall Beam 286.00m Rock boulder revetment 365m Placement of interlocking blocks 790sqm beacons supply & installation 2nos Installation of two arm...

The Construction of H.A. Ihavandhoo harbour was awarded to MTCC on 26th August 2019 by the Ministry of National Planning and Infrastructure.   This project includes: Construction of 284m breakwater 178 revetment 95m quaywall Construction of a ramp . and walkway Construction of a 4581.5 sqm of pavement Installation of 20 mooring blocks,...

The construction of H.A. Kelaa harbour (phase 2) was signed between MTCC and the Ministry of National Planning and Infrastructure in 30th July 2019. We successfully completed Phase Two of the harbor construction project in Kelaa, Haa Alif Atoll on 9th July 2020. Scope of the work...