Design and Build of GDh. Faresmaathodaa Airport was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 10th November 2020. Scope of the project includes Construction of 1200m runway, taxiway, apron with shoulder and service roads with all operational facilities The project is...

GDh. Maavarulu Airport Building Phase 2 project was handed over to MTCC by Ministry of Transport and Civil Aviation on 25th July 2019.  Work being conducted under the project includes Development of Passenger Terminal Building Development of fire Building, staff quarter Development of powerhouse, guard post, restaurant and...

GDh. Maavarulu Harbour Extension project was handed over to MTCC by Ministry of National Planning, Housing and Infrastructure on 16th September 2019.  Work being conducted under the project includes Construction of 199m breakwater Construction of 30m revetment Construction of 50m quay wall Harbour pavement 250sqm Installation of...

G.Dh. Madaveli harbour project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 7th August 2018.   The scope of this project included: Dredging: Maint. dredging of existing channel - 4,999.79...

This project was awarded to MTCC on 27th March 2016 by the Ministry of Housing and Infrastructure. The project was completed on 2nd January 2019.   This project included: Sand fill to as per the drawing provided to MSL+1.4m 11,219 .0Cbm Construction and installation of concrete culvert (width-6m, length-15m,...

MTCC started work on this project in March 2016. This project was completed in January 2018.   The Scope of this project included: Dredging: Maint Dredging of existing basin (Cbm)-12,270cbm Breakwater & revetment: Breakwater construction(sand bund) 62m Quaywall- QW block instllation 154m Harbour pavement- Installation of blocks 572sqm...

Awarded in 2015, Phase two of G.Dh. Gahdhoo Harbour project was signed between MTCC and the Ministry of Housing and Infrastructure. The project was completed in 2018.   This project included: Dredging: Maint. dredging of new harbour basin - 17,236.0 Cbm, Maint. dredging of existing channel -100.0 Cbm,...

G.Dh. Thinadhoo Soft Coastal Protection Measures project was assigned to MTCC by the Government of Maldives, and work commenced on the project on 16th February 2015 and the project was completed on 24th September 2016. The main components of this project include, a shore protection...