28 Dec Design and Build of Shore Protection Structures at V.Fulidhoo
MTCC was assigned the Design and Build of Shore Protection Structures at V.Fulidhoo by Ministry of National Planning, Housing and Infrastructure on 28th December 2020 Scope of the project includes Dredging & Excavation of 2,127.50cbm Construction of 210m groynes Construction of 270m breakwater The value of the...