B. Thulhaadhoo Harbour Project was awarded to MTCC on 9th February back in 2014. The work for this project, awarded by the Ministry of Housing and Infrastructure, was completed on 25th December 2017.   The scope of this project included: Construction of rock boulder breakwater of total length...

B. Eydhafushi capping work was awarded to MTCC in 2015 by  the Ministry of Housing and Infrastructure. The Project comprised of extension of the existing quay wall with breakwater and adjacent shores protected with revetment. The project originally contained the following scope, namely; sandblasting of...

The construction of of B. Fehendhoo harbour was awarded to MTCC on 2nd July 2019 by  the Ministry of National Planning and Infrastructure. Work on Design and Build of B. Fehendhoo Harbour is well underway, with overall 75% project progress. We have completed quay wall construction...

The project to design and build the harbor of B. Fulhadhoo was handed over by Ministry of National Planning, Housing and Infrastructure to MTCC on 02nd July 2019 .  Work being conducted under this project includes Channel Dredging of 29,167.50cbm  Dredging of Harbour basin 22,694cbm development of 108m breakwater ...

The construction and development of  main roads at B. Eydhafushi was signed between the Permanent Secretary at the Ministry of Planning and Infrastructure, Zeeniya Ahmed Hameed and the COO of MTCC Shahid Hussain Moosa, on April 1st, 2019.   This project includes: 17785 sqm road Installation of storm water management...