Design and Build of AA. Maalhos Harbour was handed over to MTCC by Ministry of Planning, Housing and Infrastructure on 10 November 2020. The relating agreement of the project was signed by CEO of MTCC Adam Azim and Director of the Ministry Shaana Faroog.  The scope...

The project to construct the harbor of AA Himandhoo to modern standards was handed over to Maldives Transport and Contracting Company, MTCC by Ministry of National Planning, Housing, and Infrastructure in April 2019. Scope of the project included Conducting dredging and excavation works of 28,030-cubic-meter Construction of a 372-meter quay wall Construction of a 405-meter breakwater Construction...

This project was awarded to MTCC on 4th May 2009 by the Ministry of Housing, Transport and Environment. The work for this project, valued at MVR 999,348.70, was completed on 9th June 2010....

The project to construct A.A. Himendhoo's harbor was completed on 20th April 2020. Work done under the project includes: Dredging of harbor basin 20,330.00 cbm Entrance channel dredging 15,187.50 cbm Rock armor breakwater 140.50 m Rock armor revetment 70 m Construction of Quay wall 170 m Beacon Installation 4 nos Harbor paving works...

MTCC was award the project to construct the breakwater in A.A. Rasdhoo in 2018 by Ministry of Housing and Infrastructure. The contract was signed in 15th May 2018. MTCC completed the re-construction of 120 meter long breakwater at A.A. Rasdhoo on 23rd May 2019. Scope of this...