17 Jun In-situ wall concreting works and quay wall block installation needed for the design and build of Sh. Komandoo harbour upgrade is well underway
In-situ wall concreting works and quay wall block installation needed for the design and build of Sh. Komandoo harbour upgrade is well underway. The project received EIA approval on 12th November 2019, and was subsequently mobilized on 18th December 2019.
The scheme for this project involves channel dredging of 14,731cbm; maintenance and new harbor basin dredging of 35, 348cbm; construction of a 12m breakwater; a 20m revetment; and a 190m quay wall. The scheme also includes a 1,991sqm paved area and navigation and streetlights installation. The estimated value of the project is MVR 29.41 million.
Sorry, the comment form is closed at this time.